ST. JOSEPH, Missouri — The Missouri River barge season has been cut short by drought. Grain elevator manager Dolores Vann found out how short it was when a local trucking company revised a quote while she was still standing by the printer. A trucker she had known since high school asked whether she still believed in the free market. Vann asked whether he was planning to charge her for the answer.
He said he’d be happy to discuss it. Then his other phone rang. Vann considered that an accurate summary of where each of them stood.
Drought Shortens Missouri River Barge Season Support
the Army Corps of Engineers’ Missouri River navigation update said navigation flow support would end November 15 at the mouth of the Missouri River, two weeks before the usual December 1 date, because of persistent upper-basin drought. The decision changes how much support the river receives from upstream releases. It can narrow or complicate shipping choices when river conditions are already difficult. Vann knows that a loaded grain barge is big because when a grain barge needs replacing in a hurry everyone in town suddenly knows a man who owns a truck.
She took a walk along the dock with the trucking company owner, Hank Meyer. Hank studied the distance from the dock to the water and said he could get a truck right up to it. Vann asked which it he meant. Hank said there was a rate for either one and they could work out a rate for both.
A Grain Delivery Is Only as Cheap as the Whole Trip
Costs depend on where the load starts and ends, what equipment is available and how long anyone has to wait for a slot. An elevator considering an alternate route can ask for freight and fuel surcharges in writing and confirm when a truck or rail receiver can accept deliveries. Producers can ask whether their elevator has changed receiving hours or basis levels and compare current bids after freight. A number with no delivery date is still useful if all you plan to do is admire it.
Vann had hoped the delayed movement would clear a spot in the elevator’s schedule. Her assistant showed her that the schedule was still full because the grain was still in the elevator. Vann said she wished somebody had told the calendar. The trucker asked if she needed someone to haul the calendar too. She told him he could have last month’s for free.
At day’s end, Hank showed her a quote she could use and a delivery date she could defend to the buyer. Vann accepted and asked for a final copy. He started to print it at the office. She stood beside him until it came out. On the way back to her desk, Vann asked what the free-market question had been about. Hank said he’d forgotten and asked how much the elevator was paying for corn. Vann’s other phone rang.
More Farm.FM rural life stories
The river was offered an interview and declined to come up.
